One accountable team
Our in-house design team, permits, and build crew work under one roof, so design intent carries straight through to the finished space.
A kitchen renovation in Milton works best when the layout, the Town's permit and inspection rules and the build schedule are planned together.
Tell us about your project and our team will be in touch. Free, no-obligation consultation and site visit with our design team.
Our in-house design team, permits, and build crew work under one roof, so design intent carries straight through to the finished space.
Quality materials and proven detailing chosen for how you live, finished to the Ontario Building Code and built to hold up for the long run.
The price we quote is the price you pay. We scope the work properly before we start, so there are no lowball bids that balloon into surprise change orders later.
Design, permits, and construction handled in accordance with Ontario requirements and your municipality.
Fantastic experience with them! The team was professional, attentive, and delivered high-quality work on time and within budget. Highly recommend for anyone building or renovating their home!
Andare did an amazing job renovating my house, they turned an old and boring basement into a modern and exciting place. Their attention to detail was astounding and I couldn't be happier with the results.
Andare took our outdated house and turned it into a modern, functional space. The new addition blends seamlessly with the existing structure.
Our basement went from an unfinished storage space to a fully functional family room. Amazing transformation, 5 stars, 100% recommend.
Andare delivered excellent quality and great service. The team was professional and made everything easy.
A complete kitchen renovation coordinates cabinetry, counters, backsplash, appliances, plumbing, electrical, lighting, ventilation, flooring, and the walls around the room. The work can include removing old cabinets and finishes, repairing subfloors and walls, installing custom or semi-custom cabinetry, templating stone counters, setting tile, connecting sinks and dishwashers, adding dedicated appliance circuits, improving task lighting, and venting a range hood outdoors.
Some kitchens stay in the same footprint. Others move the sink, range, refrigerator, or island to make cooking and circulation easier. Opening the kitchen to a dining or family room may add structural engineering, a beam, posts, new duct routes, ceiling repairs, and flooring across the adjoining space. Those are different projects even when the finished photos both show "a new kitchen."
Layout comes first. The plan must account for door swings, working aisles, seating clearance, waste and recycling, pantry storage, small appliances, and how several people move through the room. An island that looks generous on a plan can make the dishwasher, oven, or refrigerator difficult to use if clearances are measured from cabinets instead of handles and open doors.
Appliances need to be selected early because their dimensions and services control cabinetry, panels, counter openings, water lines, gas or electrical feeds, ventilation, and delivery access. A high-output range may require a different hood and make-up air strategy. An induction range or wall oven can require electrical capacity that the existing panel does not have.
Homeowners also decide whether to keep or remove walls, retain the existing floor, use stock, semi-custom, or custom cabinetry, and choose the finish level for doors, hardware, counters, backsplash, sinks, faucets, and lighting. Long-lead cabinetry, appliances, and decorative fixtures should be ordered against the construction schedule, not after the room is already open.
The condition of the cabinets, services, layout, and adjoining rooms determines the appropriate scope.
This keeps the cabinet boxes, appliance locations, plumbing, and walls. It can include cabinet painting or new fronts, hardware, counters, backsplash, sink, faucet, lighting, and paint. It fits when storage and clearances work, cabinets are sound, and no moisture or electrical problem needs the room opened.
This removes cabinets, counters, flooring, and finishes but returns the major appliances and sink to roughly the same locations. New cabinetry can improve storage and function without extensive structural or plumbing relocation. Electrical and ventilation can still require upgrades to serve modern appliances.
This moves the sink, range, refrigerator, island, pantry, doors, or windows within the existing room. It adds design, rough-in, patching, and inspection work. Choose it when the current work zones or circulation are the real problem rather than the age of the finishes.
This removes or changes walls and carries new ceilings, flooring, lighting, and trim into adjoining rooms. It often requires engineering and a permit, plus routes for services that used to run through the wall. It is appropriate when the kitchen needs a new relationship to dining and living space.
A complete quoted scope can include design drawings, cabinet layouts and elevations, a finish schedule, demolition, disposal, framing, drywall repair, flooring, cabinetry, hardware, counters, backsplash, sink and faucet installation, plumbing and electrical rough-ins, lighting, ventilation, painting, permits for the agreed regulated work, and final cleanup. It should state whether the work continues into the dining room, hall, mudroom, or family room.
Appliances, stools, loose furniture, window coverings, dishes, countertop accessories, and work in rooms outside the drawings are commonly excluded unless named. Appliance installation is not one catch-all item: delivery, panel installation, gas connection, water connection, electrical hookup, and removal of old units should each have a responsible party.
Concealed repairs are also separate unless they can be confirmed and priced in advance. Water-damaged subfloor, unsafe wiring, inadequate panel capacity, asbestos-containing flooring, blocked ducts, and plumbing that does not meet the proposed layout can change the work after demolition. The quote should explain the known assumptions and how a discovered condition will be documented.
Older kitchens may share too few circuits, and an existing panel may not have the capacity or spaces required for an induction range, wall ovens, dishwasher, microwave, refrigerator, and counter receptacles. Appliance specifications and panel conditions are reviewed before cabinetry is released so electrical upgrades are not discovered after cabinets arrive.
Cabinet depths alone do not show open oven doors, dishwasher loading, stool space, or the path from the back door to the rest of the house. Andare's in-house design team tests clearances with appliances and seating in use before fixing plumbing, electrical, and cabinet dimensions.
A wall may carry floor or roof loads and conceal ducts, drains, water lines, and wiring. Andare identifies the engineering and rerouting work during design, including where a beam and posts will land and what ceilings or floors must be repaired.
Cabinetry cannot be finalized without appliance dimensions. Counters cannot be templated until base cabinets are installed. Backsplash follows the counter, and some plumbing hookups follow both. The selection and ordering schedule follows those dependencies so one missing decision does not idle the site.
Replacing cabinets and finishes in the same locations may not need a building permit. Removing a load-bearing wall or making regulated structural, plumbing, or mechanical changes often does. Electrical work must follow the applicable inspection path. Andare reviews the actual drawings instead of treating every kitchen as permit-free or permit-required.
A beam, new exterior opening, relocated drain, or altered ventilation route can add drawings and inspections that a same-footprint cabinet replacement does not require. That difference should be established before the construction calendar and price are compared with a cosmetic project.
Many families stay home during a contained kitchen renovation, but they need a temporary setup with a refrigerator, microwave or other permitted cooking appliance, water access, and food storage outside the work zone. Dust separation, delivery routes, pet safety, and periods without water or power are planned before demolition. Moving out may be more practical when the kitchen is part of a larger main-floor or whole-home project.
Finish decisions should be based on use as well as appearance. Cabinet construction, drawer hardware, counter porosity, grout maintenance, floor transitions, lighting colour, and hood noise all affect daily experience. A finish allowance is useful only when it matches the type and quality of material the homeowner expects to select.
Planning kitchen renovations in Milton? Talk it through with our in-house design team.
Custom cabinetry and millwork adds made-to-measure storage, integrated panels, specialty interiors, banquettes, or a pantry wall. It also adds shop-drawing approvals and fabrication lead time, so appliance and finish decisions need to happen earlier.
An open-concept renovation expands the project beyond cabinets and counters. Engineering, a beam, service rerouting, ceiling repairs, and continuous flooring can materially change both schedule and budget. The kitchen layout should be tested with that structural plan, not drawn first and reconciled later.
A whole-home renovation may combine the kitchen with bathrooms, flooring, stairs, panel upgrades, HVAC, or windows. Coordinating those items in one project can avoid opening the same walls twice. A nearby bathroom renovation adds separate waterproofing, tile, ventilation, and plumbing work and may affect how long household facilities are unavailable.
Andare's in-house design team connects cabinet and appliance dimensions with structure, plumbing, electrical capacity, ventilation, lighting, and the construction sequence. The goal is a kitchen plan that works when doors are open, people are seated, groceries come in, and several trades need accurate rough-in locations.
The company is licensed, insured, and WSIB-covered, and homeowners have rated Andare 5.0 stars across 54 Google reviews. Call (416) 524-1165 to discuss your kitchen layout, finishes, services, and adjoining rooms.
A kitchen renovation in Milton is a permit question, a design question and a scheduling question at the same time. The Town of Milton states that a building permit is needed before any renovation can begin, and that building without one can bring fines and penalties under the Building Code Act. Whether your kitchen needs one depends on what changes. Andare Homes designs and builds kitchens across Milton, from newer subdivision homes and townhouses to older houses in Old Milton and rural-residential properties near Campbellville.
Our in-house design team plans the layout, cabinetry, lighting and finishes with the same people who will build it, so the drawings reflect real construction, real lead times and the Town's submission rules.
Residential permits for alterations, additions, secondary suites and new builds are submitted through the Town's online services tool. The application and all drawings and forms must be submitted as PDF files generated directly from the design software, not scans, with printing and markup permissions switched on so staff can mark up the plans.
After a first completeness review, the Town sends an invoice for permit fees, and the full review starts once the fees are paid. Building Services will email you if it needs more information and again when the permit is issued.
Once a permit is issued, the permit holder or owner is responsible for booking every required inspection through the online portal. The Town's inspections confirm compliance with the Ontario Building Code, Town by-laws and Region of Halton requirements. For a kitchen that involves plumbing, heating or framing changes, inspections follow the work stages.
The Town's finished-basement guidance says cooking facilities are not permitted in a finished basement unless the space qualifies as a secondary dwelling unit. If you are thinking about a second kitchen below grade for a parent or tenant, that rule comes before the design. The Town also runs an Additional Residential Unit program with its own pages for building and registering a unit.
For listed heritage properties, the Town says no heritage permit is needed for alterations or additions, but for designated properties a heritage permit under the Ontario Heritage Act is required for changes. If your home is in Old Milton, check its status before planning exterior changes such as a new window over the sink. Properties near creeks and valleys can also fall inside Conservation Halton's regulated area, which was redefined by Ontario Regulation 41/24 in April 2024.
The Electrical Safety Authority advises hiring a Licensed Electrical Contractor, who files the notification of work and can provide a Certificate of Acceptance. All of our trades are licensed and insured.
We work in Old Milton, Scott, Harrison, Clarke, Coates, Beaty, Dempsey, Ford and Campbellville. For the wider scope of work we do in town, see our Milton home renovation page, or look at bathroom renovations in Milton, basement renovations in Milton and whole-home renovations in Milton. Our main kitchen renovation page explains the design-build approach in general.
The rules and facts on this page come from these official pages. Rules change, so confirm the current version with the municipality before you apply.
The Town of Milton states that a building permit is needed before any renovation can begin and that building without one can result in fines and penalties. Cosmetic changes may differ from structural, plumbing or heating work, so Andare confirms the permit position with the Town for your plan before pricing it as final.
Residential permits are submitted through the Town's online services tool as PDF files, with the Application for a Permit to Construct or Demolish, any required designer forms and the drawings. Fees are due once the Town accepts the package, and the full review begins after payment.
Not by default. The Town states that cooking facilities are not permitted in a finished basement unless the space qualifies as a secondary dwelling unit, so the zoning and unit requirements are settled first.
It can. The Town says listed properties do not need a heritage permit for alterations or additions, while designated properties do under the Ontario Heritage Act. We check the status early.
All of our trades are licensed and insured. Electrical work is done by a Licensed Electrical Contractor who files the notification of work with the Electrical Safety Authority.
Most households do. We plan a temporary kitchen, dust control and safe access, and agree on working hours before demolition begins.
The schedule depends on design decisions, cabinet lead times, permit needs and existing conditions. We give you a realistic timeline once the design, selections and permit position are known.
Still have a question about kitchen renovations in Milton? Ask our in-house design team directly.
Design-build services across Milton. See all services in Milton →
We design and build across the GTA. Explore the areas next to Milton.
Custom homes, additions, renovations, and multiplexes, designed and built for homeowners, architects, designers, and engineers.
Tell us about the Milton home, the kitchen you have now and how you want to use it. Andare's in-house design team will outline layout options and the permit questions for your address; call (416) 524-1165.
Backed by our workmanship warranty, we stand behind every job · Licensed, Insured and WSIB-Covered
Tell us about your project and our team will be in touch. Free, no-obligation consultation and site visit with our design team.
Andare Homes provides kitchen renovations, designed and built by one accountable team across the GTA.
Three fields. Our design team replies with the next step.